Title : Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017
link : Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017
Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017
From a special report on energy, in The Wall Street Journal, back in 2015.Liberty Resources, Page R6
What the future of oil drilling will look like -- case study: Liberty Resources, the Bakken. Regular readers already know about this; we've been talking about the "manufacturing stage" in the Bakken for the past several years.
Here's the graphic:
Note the graphic above: 12 wells per pad. In the graphic above, there are six 1280-acre drilling units. That's 72 wells. In fact, that's just the start. Others may have seen this coming long ago, but it was Harold Hamm who espoused it publicly over and over. And over. There will be enough wells in this one "manufacturing unit" to support a salt water disposal well, eliminating the need for trucking water to an off-site SWD well.
Thus Article Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017
That's an article Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017 with the link address https://mylivemyidea.blogspot.com/2017/06/worth-reposting-building-oil-factory-in.html
0 Response to "Worth Reposting -- Building An "Oil Factory" In The Bakken -- June 22, 2017"
Post a Comment