Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018 - Hallo friends
MY LIVE MY WAY, In the article you read this time with the title Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings
Article my style,
Article my way,
Article New ways,
Article their way, We write this you can understand. Alright, good read.
Title :
Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018link :
Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018
Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018
Link here. From a press release --
THE WOODLANDS, Texas, March 16, 2018 -- Smart Sand, Inc. announced that it acquired the rights to operate a unit train capable transloading terminal in Van Hook, North Dakota to service the Bakken Formation.
The Company paid consideration of approximately $15.5 million to acquire certain assets at the Van Hook terminal, and has entered into a long-term lease agreement in connection with the transaction. As part of this transaction, Smart Sand and Canadian Pacific have entered into a long-term agreement to service Van Hook directly along with the other key oil and gas exploration and production basins of North America. The Company expects to have the Van Hook facility operational in April 2018.
Thus Article Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018
That's an article Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018 with the link address https://mylivemyidea.blogspot.com/2018/03/existing-frack-sand-transloading.html
Related Posts :
Random Update Of An Incredible Re-Fracked MRO Well -- July 13, 2018 -- A Brand New Well For "Free"A reader alerted me to this one. I had posted this one back in January, 2018, and then forgot about it.
For newbies, two things:
this show… Read More...
Colgate EALL (14)This job sure entails a diverse range of items, from architectural millwork, sliding doors, to furniture, to windows, and so forth. It’s fun… Read More...
LOL: WTI Pares Back Some Gains After Reports That White House Might Release Oil From The SPR -- July 13, 2018Not even worth blogging about. It is what it is.
https://ift.tt/2dZyQXu
… Read More...
Whiting With Three New Permits Northeast Of Williston -- July 13, 2018Active rigs:
$70.79→
7/13/2018
07/13/2017
07/13/2016
07/13/2015
07/13/2014
Active Rigs
67
59
30
72
190
Three new permits:
Opera… Read More...
Random Update On Well Being Drilled Southwest Of Dickinson -- July 13, 2018About a mile southwest of Minot:
34711, conf, Armstrong Operating, Harvest States 7-11, Eland,
Other wells in the graphic below:
13819, 2… Read More...
0 Response to "Existing Frack Sand Transloading Terminal In Van Hook Changing Hands -- March 17, 2018"
Post a Comment