Title : Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated
link : Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated
Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated
API crude oil inventory data:- forecast: a build of 1.0 million bbls
- actual: a build of 5.321 million bbls
- WTI after the announcement: nearly unchanged at $65.25
The impetus for the cut in rating is the company’s slipping production rates for its newer “Model 3” sedan, something that has been worrying multiple parties of late, as Barron's Ben Levisohn wrote earlier today.
As Moody's put it: Tesla's ratings reflect the significant shortfall in the production rate of the company's Model 3 electric vehicle. The firm writes that it’s conceivable the company may have to do a large capital raise: The negative outlook reflects the likelihood that Tesla will have to undertake a large, near-term capital raise in order to refund maturing obligations and avoid a liquidity short-fall.
***************************
Back to the Bakken
Active rigs:
$65.25→ | 3/27/2018 | 03/27/2017 | 03/27/2016 | 03/27/2015 | 03/27/2014 |
---|---|---|---|---|---|
Active Rigs | 59 | 49 | 32 | 97 | 196 |
Three new permits:
- Operator: CLR
Field: Banks (McKenzie)
Comments: CLR has permits for a 3-well Pasadena pad in SWSW 11-152-99, Banks oil field
WPX (4):
Thunderbird Resources (3):
NP Resources (2):
Petro Harvester (2):
Two permits canceled:
Petro-Hunt: two Moberg permits in Burke County
Six producing wells (DUCs) reported as completed:
30135, 4,881, MRO, Deane USA 24-22H,
31610, 349, BR, He 5-8-20UTFH,
31611, 467, BR, He 4-8-20MBH,
31613, 450, BR, He 2-8-20MBH,
32978, 10, BR, Dodge 3C TFH,
33337, 56, BR, Dodge 2A TFH,
Three permits reinstated:
- Slawson: three Hunter permits in Mountrail County
Thus Article Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated
That's an article Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated with the link address https://mylivemyidea.blogspot.com/2018/03/three-new-permits-six-ducs-completed.html
0 Response to "Three New Permits; Six DUCs Completed -- March 27, 2018 -- This Page Still Being Updated"
Post a Comment