CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018

CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018
link : CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018

Read too


CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018

API: a huge build -- an increase of 3.427 million bbls; oilprice.com headline: "oil crumbles as API reports large crude build." In fact, WTI is stable, up slightly. It gets tedious -- the headlines over at oilprice.com are written in anticipation of "what should happen" based on the data. No, I did not read the story.


EIA weekly data: to be reported tomorrow morning, 9:30 CDT.


**************************************
Back to the Bakken

Active rigs:

$67.47 5/1/2018 05/01/2017 05/01/2016 05/01/2015 05/01/2014
Active Rigs 60 49 29 86 187

Twelve new permits:
  • Operator: CLR
  • Field: Banks (McKenzie)
  • Comments: CLR has permits for a 12-well Patterson/Pittsburgh/Kuhn/Uhlman pad in lot 4 section 7-152-99; at about 1,200 feet FSL and 100 - 1,000 FWL, lot 4 looks like it is in the southwest quarter of the section (see below).
Two permits were canceled: XTO canceled two Myrna permit in Williams County

***************************************
The well:
  • 28737, 1,423, CLR, Uhlman 1-7H, Banks, t1/15; cum 512K boe 3/18; no evidence this well has been re-fracked (no sundry form; FracFocus):
Pool Date Days BBLS Oil Runs BBLS Water MCF Prod MCF Sold Vent/Flare
BAKKEN 3-2018 19 2939 2473 4693 3998 3826 38
BAKKEN 2-2018 23 3491 3681 5708 6194 136 5881
BAKKEN 1-2018 22 3552 3173 9364 7376 0 7202
BAKKEN 12-2017 0 0 0 0 0 0 0
BAKKEN 11-2017 2 4 205 0 0 0 0
BAKKEN 10-2017 31 2859 3207 1601 5946 5779 39
BAKKEN 9-2017 29 5515 5402 3730 12322 11670 434
BAKKEN 8-2017 31 6631 6543 3935 14745 14468 31
BAKKEN 7-2017 31 6454 6195 4002 12385 11844 300
BAKKEN 6-2017 30 5715 5794 3760 11133 10570 340


Thus Article CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018

That's an article CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018 with the link address https://mylivemyidea.blogspot.com/2018/05/clr-has-permits-for-12-well-pad-in.html

Subscribe to receive free email updates:

0 Response to "CLR Has Permits For A 12-Well Pad In Banks Oil Field -- May 1, 2018"

Post a Comment