Random Look At Curve Build Study For A Bakken Well -- May 20, 2018

Random Look At Curve Build Study For A Bakken Well -- May 20, 2018 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title Random Look At Curve Build Study For A Bakken Well -- May 20, 2018, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : Random Look At Curve Build Study For A Bakken Well -- May 20, 2018
link : Random Look At Curve Build Study For A Bakken Well -- May 20, 2018

Read too


Random Look At Curve Build Study For A Bakken Well -- May 20, 2018

The well:
  • 30171, 144, QEP, MHA 5-32-28H-150-91, Heart Butte, 51 stages, 10 million lbs, all mesh, t11/17; cum 112K 3/18;
Curve build study for #33634:


The geologist's report also has a great discussion of drilling the lateral.


Thus Article Random Look At Curve Build Study For A Bakken Well -- May 20, 2018

That's an article Random Look At Curve Build Study For A Bakken Well -- May 20, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article Random Look At Curve Build Study For A Bakken Well -- May 20, 2018 with the link address https://mylivemyidea.blogspot.com/2018/05/random-look-at-curve-build-study-for.html

Subscribe to receive free email updates:

0 Response to "Random Look At Curve Build Study For A Bakken Well -- May 20, 2018"

Post a Comment