Title : Huge Production For An MRO Ross Well -- July 10, 2018
link : Huge Production For An MRO Ross Well -- July 10, 2018
Huge Production For An MRO Ross Well -- July 10, 2018
This was previously reported/posted, but it deserves a stand-along post:This producing well (DUC) was reported as completed today:
- 23163 (see below), 3,545, MRO, Ross 42-5H, Lost Bridge, section 4-148-95, t5/18; cum 81K after one full month; fracked 3/16/18 - 4/9/18 (look at how long it took them to frack this well); 7.53 million gallons of water (on the low side); 85.5%water; 13.6% sand;
| Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
|---|---|---|---|---|---|---|---|---|
| BAKKEN | 5-2018 | 31 | 79554 | 79213 | 62145 | 62830 | 9888 | 47609 |
| BAKKEN | 4-2018 | 5 | 1175 | 994 | 0 | 2054 | 0 | 1900 |
Look at the production data for two CLR Mountain Gap wells still on confidential list; compare with that MRO Ross well noted above.
Now go back and read carefully the full post for the CLR Mountain Gap wells at that link (https://themilliondollarway.blogspot.com/2018/06/fracfocus-data-for-two-wells-currently.html).
Look how empty this area is:
It's about 24 miles southeast of Watford City as the bald eagle flies:
I don't recall if I have talked much about Lost Bridge; I check that out later. But Lost Bridge is in an incredible neighborhood. It's just south of one of the best fields in the Bakken, the "Helis Grail." And it's just west of another nice field, the Eagle Nest.
Finally, zooming in, here are the four wells as they are today:
The wells:
- 23162, 1,339, MRO, Bear Den 42-5TFH, Lost Bridge, t11/12; cum 267K 5/18; off-line for almost the entire past twelve months (one year);
- 23163, 3,545, MRO, Ross 42-5H, Lost Bridge, section 4-148-95, t5/18; cum 81K after one full month; fracked 3/16/18 - 4/9/18 (look at how long it took them to frack this well); 7.53 million gallons of water (on the low side); 85.5%water; 13.6% sand;
- 32517, 3,438, MRO, Ryan 42-5TFH, Lost Bridge, t5/1; cum 35K 5/18; 35K in the first full month;
- 32518, 2,774, MRO, Struthers USA 41-5H, Lost Bridge, t5/18; cum 10K the first full month;
Thus Article Huge Production For An MRO Ross Well -- July 10, 2018
That's an article Huge Production For An MRO Ross Well -- July 10, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Huge Production For An MRO Ross Well -- July 10, 2018 with the link address https://mylivemyidea.blogspot.com/2018/07/huge-production-for-mro-ross-well-july.html




0 Response to "Huge Production For An MRO Ross Well -- July 10, 2018"
Post a Comment