Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018

Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018
link : Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018

Read too


Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018

Petro-Hunt Charlson USA wells in 154-94-13 are tracked here.

The Petro-Hunt Charlson USA wells at this post are in 153-95-4.

The Petro-Hunt Charlson USA wells are always interesting. Take a look at this one:
  • 27208, 2,262, Petro-Hunt USA 153-95-4B-8-2HS, t12/14; cum 540K 5/18; producing 6,000 bbls/month (5/17); not on a pump as of 5/18;
Now look at the production profile, look at the jump in production, 9/17; it was off-line for less than a month. A well from the south (#30685, USA 153-95-9C-4-3H, was tested 8/17 which corresponds with the jump in production below).
Monthly Production Data:
Pool Date Days BBLS Oil Runs BBLS Water MCF Prod MCF Sold Vent/Flare
BAKKEN 5-2018 31 9702 9493 3503 23476 23168 92
BAKKEN 4-2018 30 9603 9789 4073 23102 22075 818
BAKKEN 3-2018 31 11137 11215 3578 25090 24874 0
BAKKEN 2-2018 28 10815 10760 3632 22717 21980 542
BAKKEN 1-2018 31 12081 12092 3947 23406 23190 0
BAKKEN 12-2017 31 12802 12759 3467 22487 22271 0
BAKKEN 11-2017 30 13347 13333 3473 24488 10475 13804
BAKKEN 10-2017 31 15604 15618 3143 27292 0 27076
BAKKEN 9-2017 30 14613 14131 2552 23480 0 23299
BAKKEN 8-2017 3 554 914 117 2110 2089 0
BAKKEN 7-2017 31 5740 5789 1252 20515 20299 0
BAKKEN 6-2017 30 6092 6129 1372 20436 19751 476
BAKKEN 5-2017 31 5926 5669 1350 19643 6863 12564
BAKKEN 4-2017 30 9192 9240 1415 20129 19920 0

The graphic:



Other wells in that graphic:
  • 27208, 2,262, Petro-Hunt, USA 153-95-4B-8-2HS, Charlson, t12/14; cum 540K 5/18; huge jump in 9/17;
  • 27918, 1,167, Petro-Hunt, USA 153-95-4B-8-1HS, Charlson, t12/14; cum 390K 5/18; huge jump in 9/17;
  • 20342, 1,430, Petro-Hunt, USA 153-95-4B-8-1H, Charlson, t11/11; cum 828K 5/18; huge jump in 9/17; closing in on one million bbls cumulative (858,278 bo + 1,283,115 MCF = 858,278 + 213,817 boe = 1.07 million boe in less than seven years; Bakken wells will produce for 30+ years

  • 30685, from the south, running north, 1,380, Petro-Hunt, USA 153-95-9C-4-3H, Charlson, t8/17; cum 121K 5/18; huge jump in 9/17;

  • 11983, 60/220 (Bakken/Silurian); from the Bakken only (Silurian is now PNA), Petro-Hunt, USA 5D-4-4HR, Charlson, t5/08; cum 196K 5/18;







Thus Article Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018

That's an article Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018 with the link address https://mylivemyidea.blogspot.com/2018/07/random-update-petro-hunt-charlson-usa.html

Subscribe to receive free email updates:

0 Response to "Random Update, Petro-Hunt, A Charlson USA Well -- July 5, 2018"

Post a Comment