Title : Results Of Wells Coming Off Confidential List -- October 15, 2018
link : Results Of Wells Coming Off Confidential List -- October 15, 2018
Results Of Wells Coming Off Confidential List -- October 15, 2018
These are the wells coming off the confidential list over the weekend and today.Kraken Operating is not afraid of using sand -- using in excess of 20 million lbs. Wow.
CLR has a great second bench well. Think about that for a minute. And the roughnecks are still drilling the vertical in two days, building the curve in about 1.5 days; and drilling the lateral in about 2.5 days. I think this incredibly remarkable. And they do it day after day, and rarely do they have a "miss." Anyone that's followed the oil industry has to know that it's just remarkable to have success rates like this. And I guess that's why it's called the "manufacturing" stage in the Bakken.
Monday, October 15, 2018:
- 34473, SI/NC, XTO, FBIR Ironwoman 31X-10G, Heart Butte, no production data,
- 34140, SI/NC, WPX, Raptor 13-24HEL, Reunion Bay, no production data,
- 29773, 213, Slawson, Gobbler Federal 3-35-26TFH, Big Bend, no presidential pardon for this one, just in time for Thanksgiving; t8/18; cum --; vertical drilled in 55 hours; drilling of the curve began on May 7, 2018, just after midnight, and completed in 15 hours; the lateral section begun in late afternoon on May 9, and was drilled in 51.5 hours; TD of 20,190 feet; gas peaked at 2,717 units; the wellbore was in the zone 100%;
- 34472, SI/NC, XTO, FBIR Ironwoman 31X-10C, Heart Butte, no production data,
- 33821, 961, Oasis, Lite 5393 11-11 3BX, Sanish, 50 stages; 10.1 million lbs, big well; t4/18; cum 102K 8/18;
- 33454, 738, Equinor Energy, Weisz 11-14 6H, Painted Woods, 48 stages; 9.5 million lbs, t4/18; cum 35K 8/18;
- 34418, 930, Kraken Operating, Michelle Lauren 1H, New Home, 60 stages; 20 million lbs, a nice well; t4/18; cum 84K 8/18;
- 34417, 679, Kraken Operating, Ellie Rose 11TFH, New Home, 60 stages; 20 million lbs, a nice well; t4/18; cum 75K 8/18;
- 33820, 683, Oasis, Lite 5393 11-11 4TX, Sanish, 50 stages; 10 million lbs, a nice well; t4/18; cum 81K 8/18;
- 33558, 2,294, CLR, Mountain Gap 4-10H2, Rattlesnake Point, second bench; two days to drill vertical portion; the curve took about 36 hours to build; error in reporting dates so unable to tell how long it took to drill the lateral, probably two days; gas exceeded 6,000 units; at one time reaching 7,800 units; flare maxed at 5 feet; 64 stages; 10 million lbs, a huge well; t7/18; cum 77K 8/18;
- 32019, SI/NC, Hess, CA-Stangeland-155-95-2128H-7, Capa, no production data,
Thus Article Results Of Wells Coming Off Confidential List -- October 15, 2018
That's an article Results Of Wells Coming Off Confidential List -- October 15, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Results Of Wells Coming Off Confidential List -- October 15, 2018 with the link address https://mylivemyidea.blogspot.com/2018/10/results-of-wells-coming-off.html
0 Response to "Results Of Wells Coming Off Confidential List -- October 15, 2018"
Post a Comment