BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019

BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019
link : BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019

Read too


BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019

Active rigs:

$59.07 3/25/2019 03/25/2018 03/25/2017 03/25/2016 03/25/2015
Active Rigs 68 60 49 32 98

Nine new permits:
  • Operators: BR (8); Slawson;
  • Fields: Dimmick Lake (McKenzie); Big Bend (Mountrail)
  • Comments:
    • BR has permits for an 8-well Maverick/Stortroen pad in Dimmic Lake oil field, section 12-151-97;
    • Slawson has a permit for a Periscope Federal well in Big Bend, section 15-151-92
Two permits renewed:
  • SHD: a Maya permit in McLean County
  • Whiting: a Pronghorn State Federal permit in Billings County
One producing well (DUC) reported as completed:
  • 34253, 207, BR, Raider 4A MBH, Twin Valley, t2/19; cum --;


Thus Article BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019

That's an article BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019 with the link address https://mylivemyidea.blogspot.com/2019/03/br-with-eight-new-permits-and-br.html

Subscribe to receive free email updates:

Related Posts :

0 Response to "BR With Eight New Permits; And, BR Reports A Completed DUC -- March 25, 2019"

Post a Comment