Title : The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019
link : The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019
The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019
The three Enerplus wells that came off confidential list today:- 34416, 1,086, Enerplus, Scissors 149-93-04B-03H, 33-025-03421, 34 stages; 8.2 million lbs, Mandaree, t10/18; cum 83K 1/19; total drilling days, 18; total drilling hours, 109.4 hours; a strong gas show of 4,981 units while drilling the Lodgepole; the well landed an estimated 25 feet into the middle Bakken; the target was the "Clean B" and appeared somewhat thicker than prognosis; no trips in the lateral; connection gases built to hte 3,300 to 5,000 unit range after 17,500' MD; a 20' flare noted.
| Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
|---|---|---|---|---|---|---|---|---|
| BAKKEN | 1-2019 | 31 | 18521 | 18585 | 15685 | 18521 | 13023 | 3749 |
| BAKKEN | 12-2018 | 24 | 17744 | 17498 | 14802 | 17744 | 8333 | 8446 |
| BAKKEN | 11-2018 | 24 | 18375 | 18677 | 14948 | 18375 | 9822 | 8123 |
| BAKKEN | 10-2018 | 30 | 27582 | 27539 | 35325 | 27582 | 6068 | 20984 |
| BAKKEN | 9-2018 | 3 | 998 | 375 | 1106 | 998 | 552 | 405 |
- 34415, 1,490, Enerplus, Thimble 149-93-04B-03H, 33-025-03420, 34 stages; 11.9 million lbs, Mandaree, t10/18; cum 113K 1/19; drilling days, 17; drilling hours, 122.3; target: middle Bakken C Zone; Stoneham Rig 18 walked form the Thimble 149 well to this location on June 25, 2018; no trips in the lateral; much lower gas than Scissors but at 21,184' MD gas was over 3,400 units with a 10 - 15' flare.
| Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
|---|---|---|---|---|---|---|---|---|
| BAKKEN | 1-2019 | 17 | 15390 | 15803 | 12688 | 15390 | 11074 | 3472 |
| BAKKEN | 12-2018 | 31 | 25475 | 25187 | 19573 | 25475 | 11994 | 11758 |
| BAKKEN | 11-2018 | 29 | 29844 | 30254 | 23547 | 29844 | 15910 | 13178 |
| BAKKEN | 10-2018 | 30 | 42213 | 41376 | 63534 | 42213 | 9117 | 32373 |
| BAKKEN | 9-2018 | 3 | 264 | 99 | 4416 | 264 | 146 | 102 |
- 34414, 1,450, Enerplus Tailor 149-93-04B-03H-TF, 33-025-03419, 34 stages; 10.2 million lbs, Mandaree, t10/18; cum 73K 1/19; total days drilling, 24; total drilling hours, 114.9; drilling the lateral, an intermittent 2' - 1' flare was established; connection gases built to 3,500 - 4,000 units by 11,000' MD; flare became more consistent after 17,500'. No trips in the lateral. Trip gas after the short trip at TD of 21,224' MD was only 1,400 units with a 4' flare.
| Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
|---|---|---|---|---|---|---|---|---|
| BAKKEN | 1-2019 | 20 | 8620 | 8953 | 9569 | 8620 | 6273 | 1728 |
| BAKKEN | 12-2018 | 31 | 17376 | 17084 | 17036 | 17376 | 8135 | 7992 |
| BAKKEN | 11-2018 | 27 | 15122 | 15562 | 17127 | 15123 | 8184 | 6514 |
| BAKKEN | 10-2018 | 30 | 30319 | 30723 | 40331 | 30320 | 6770 | 22974 |
| BAKKEN | 9-2018 | 2 | 1838 | 690 | 8865 | 1839 | 1016 | 776 |
Thus Article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019
That's an article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019 with the link address https://mylivemyidea.blogspot.com/2019/03/the-enerplus-tailor-pad-in-mandaree-oil.html
0 Response to "The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019"
Post a Comment