The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019

The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019
link : The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019

Read too


The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019

The three Enerplus wells that came off confidential list today:
  • 34416, 1,086, Enerplus, Scissors 149-93-04B-03H, 33-025-03421, 34 stages; 8.2 million lbs, Mandaree, t10/18; cum 83K 1/19; total drilling days, 18; total drilling hours, 109.4 hours; a strong gas show of 4,981 units while drilling the Lodgepole; the well landed an estimated 25 feet into the middle Bakken; the target was the "Clean B" and appeared somewhat thicker than prognosis; no trips in the lateral; connection gases built to hte 3,300 to 5,000 unit range after 17,500' MD; a 20' flare noted.
Pool Date Days BBLS Oil Runs BBLS Water MCF Prod MCF Sold Vent/Flare
BAKKEN 1-2019 31 18521 18585 15685 18521 13023 3749
BAKKEN 12-2018 24 17744 17498 14802 17744 8333 8446
BAKKEN 11-2018 24 18375 18677 14948 18375 9822 8123
BAKKEN 10-2018 30 27582 27539 35325 27582 6068 20984
BAKKEN 9-2018 3 998 375 1106 998 552 405
  • 34415, 1,490, Enerplus, Thimble 149-93-04B-03H, 33-025-03420, 34 stages; 11.9 million lbs, Mandaree, t10/18; cum 113K 1/19;  drilling days, 17; drilling hours, 122.3; target: middle Bakken C Zone; Stoneham Rig 18 walked form the Thimble 149 well to this location on June 25, 2018; no trips in the lateral; much lower gas than Scissors but at 21,184' MD gas was over 3,400 units with a 10 - 15' flare.
Pool Date Days BBLS Oil Runs BBLS Water MCF Prod MCF Sold Vent/Flare
BAKKEN 1-2019 17 15390 15803 12688 15390 11074 3472
BAKKEN 12-2018 31 25475 25187 19573 25475 11994 11758
BAKKEN 11-2018 29 29844 30254 23547 29844 15910 13178
BAKKEN 10-2018 30 42213 41376 63534 42213 9117 32373
BAKKEN 9-2018 3 264 99 4416 264 146 102
  • 34414, 1,450, Enerplus Tailor 149-93-04B-03H-TF, 33-025-03419, 34 stages; 10.2 million lbs, Mandaree, t10/18; cum 73K 1/19; total days drilling, 24; total drilling hours, 114.9; drilling the lateral, an intermittent 2' - 1' flare was established; connection gases built to 3,500 - 4,000 units by 11,000' MD; flare became more consistent after 17,500'. No trips in the lateral. Trip gas after the short trip at TD of 21,224' MD was only 1,400 units with a 4' flare.
Pool Date Days BBLS Oil Runs BBLS Water MCF Prod MCF Sold Vent/Flare
BAKKEN 1-2019 20 8620 8953 9569 8620 6273 1728
BAKKEN 12-2018 31 17376 17084 17036 17376 8135 7992
BAKKEN 11-2018 27 15122 15562 17127 15123 8184 6514
BAKKEN 10-2018 30 30319 30723 40331 30320 6770 22974
BAKKEN 9-2018 2 1838 690 8865 1839 1016 776


Thus Article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019

That's an article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019 with the link address https://mylivemyidea.blogspot.com/2019/03/the-enerplus-tailor-pad-in-mandaree-oil.html

Subscribe to receive free email updates:

0 Response to "The Enerplus Tailor Pad in Mandaree Oil Field -- March 28, 2019"

Post a Comment