Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018

Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018 - Hallo friendsMY LIVE MY WAY, In the article you read this time with the title Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018, We have prepared this article for you to read and retrieve information therein. Hopefully the contents of postings Article my style, Article my way, Article New ways, Article their way, We write this you can understand. Alright, good read.

Title : Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018
link : Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018

Read too


Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018

The well:
  • 19930, two frack/IP (see below), Statoil, Russell 10-3 1H, Painted Woods, cum 286K 2/18;
    • first frack: 5/22/11 -- 2,670, 36 stages; 4 million lbs; large/small ceramic
    • second frack: 8/11/17 -- 82, 1.9 million lbs, all mesh
For newbies: this is an important data point/random well update. The Bakken is now in the manufacturing phase. Bakken wells:
  • will be drilled
    • some will go immediately into production
    • some will be fracked/completed later (DUCs) -- within two years
  • once completed, Bakken wells will:
    • have pumps installed
    • undergo work-overs (think roto-rooter)
    • undergo mini-re-fracks
    • be re-fracked: standard re-fracks; high-intensity re-fracks
    • taken off-line while neighboring wells are fracked/re-fracked
    • come back off -line once work on neighboring wells is completed
    • be remotely "managed" for production
  • will produce for 35 years (source: NDIC) 
  • with "current" EURs of --
    • less than 500,000 bbls: poor wells
    • 500,001 - 750,000 bbls: "okay" wells for those with low expectations
    • 750,001 - 1,000,000 bbls: expectations for Bakken wells on the fringe
    • 1,000,001 -- 1,500,000: expectations for Bakekn wells inside the fringe
    • > 1.5 million bbls: currently not much said about EURs greater than 1.5 million bbls ...
#19930 is a good example of a fairly mediocre well simply undergoing a very small re-frack -- few stages (it was a long lateral) and very little proppant and it was all mesh, relatively inexpensive to re-accomplish. By the way, this well is the only one in this drilling unit and is located on the fringe.




Thus Article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018

That's an article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.

You are now reading the article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018 with the link address https://mylivemyidea.blogspot.com/2018/04/random-update-of-statoil-russel-well-in.html

Subscribe to receive free email updates:

0 Response to "Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018"

Post a Comment