The well:- 19930, two frack/IP (see below), Statoil, Russell 10-3 1H, Painted Woods, cum 286K 2/18;
-
- first frack: 5/22/11 -- 2,670, 36 stages; 4 million lbs; large/small ceramic
- second frack: 8/11/17 -- 82, 1.9 million lbs, all mesh
- will be drilled
-
- some will go immediately into production
- some will be fracked/completed later (DUCs) -- within two years
- once completed, Bakken wells will:
-
- have pumps installed
- undergo work-overs (think roto-rooter)
- undergo mini-re-fracks
- be re-fracked: standard re-fracks; high-intensity re-fracks
- taken off-line while neighboring wells are fracked/re-fracked
- come back off -line once work on neighboring wells is completed
- be remotely "managed" for production
- will produce for 35 years (source: NDIC)
- with "current" EURs of --
-
- less than 500,000 bbls: poor wells
- 500,001 - 750,000 bbls: "okay" wells for those with low expectations
- 750,001 - 1,000,000 bbls: expectations for Bakken wells on the fringe
- 1,000,001 -- 1,500,000: expectations for Bakekn wells inside the fringe
- > 1.5 million bbls: currently not much said about EURs greater than 1.5 million bbls ...
Thus Article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018
That's an article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018 This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018 with the link address https://mylivemyidea.blogspot.com/2018/04/random-update-of-statoil-russel-well-in.html
0 Response to "Random Update Of Statoil Russel Well In Painted Woods -- April 20, 2018"
Post a Comment